SL. No. Name of Work Client Value Status
1 Up-Gradation of Pumps of Existing Roll Cooling Pump House of HSM, Bokaro. SAIL/BOKARO STEEL PLANT 101,317,903.40 ONGOING
2 Fabrication & Supply of Building Steel Structures required for Bauxite Storage, Handiling and Secondary Crushing package for 1.0 MTPA Alumina Refinery Stream-5 of M/s National Aluminium Company Limited (NALCO) at Damanjodi, Odisha (011A/9678). Mecon Limited 18,26,00,000 ONGOING
3 Fabrication & Supply of Building Steel Structures required for Bauxite Storage, Handiling and Secondary Crushing package for 1.0 MTPA Alumina Refinery Stream-5 of M/s National Aluminium Company Limited (NALCO) at Damanjodi, Odisha (011B/9679). Mecon Limited 18,66,00,000 ONGOING
4 Dismantling, Fabrication and Erection Roof Structures, Trusses and along with all allied Structures from Axis 139 to Axis 145 in GH and Axis 125 to 126 & from Axis 139 to 143 HK Bay of CRM 1&2. SAIL/BOKARO STEEL PLANT 1,52,00,000 ONGOING
5 DEVELOPMENT OF ALTERNATE SYSTEM FOR DRAWAL OF RAW WATER FROM DAMODAR RIVER FOR BOKARO STEEL PLANT AND TOWNSHIP (Pkg-III): SAIL/BOKARO STEEL PLANT 78,60,00,000 ONGOING
6 Balance Works for Replacement of Battery Cyclones with 6 Nos. Electrostatic Precipitators in Sinter Plant 1 & 2 SAIL/BOKARO STEEL PLANT 33,32,00,000 ONGOING
7 Raw Material Handling System for Sinter Plant-II, (Pkg-03) SAIL/BOKARO STEEL PLANT 1,60,32,00,000 ONGOING
9 Balance Civil works for New CRM Complex (Pkg -037) SAIL/BOKARO STEEL PLANT 54,83,00,000 ONGOING
10 Replacement of 6 Nos. of Pump by Vertical Pumps in Pump House No.-1 SAIL/BOKARO STEEL PLANT 5,86,30,000 ONGOING
11 BALANCE ROAD, STORM WATER DRAIN AND SEWERAGE NETWORK( PACKAGE NO. 31ER) at IISCO STEEL PLANT, BURNPUR (WB) SAIL-IISCO STEEL PLANT, BURNPUR (WB) 50,42,00,000 ONGOING
12 Supply, Construction, Fabrication & Commissioning of Complete Civil & Structural Part of 5.0 MTPA Madhuband NLW Coal Washery Project. HEAVY ENGINEERING LTD. 31,92,00,000 ONGOING
13 SUPPLY & ERECTION OF REFRACTORIES & AUXILIARIES FOR PROTECTION LINING IN HMDS & NEW TORPEDO BAY SAIL/BOKARO STEEL PLANT 2,40,00,000 ONGOING

SOME OF EXECUTED REPAIR & MAINTENANCE JOB


SL. No. Name of Work Client Value Status
1 Supply of Pre-Fabricated Cable Trestle Structure for Buxar ESP System as per Technical Specification. L&T 18,645,770.00 COMPLETED
2 Procurement of Raw Material, manufacturing, cleaning, coating, painting, inspection, testing, packing, forwarding and loading on L&T's vehicle, for CHP Package. L&T 11,02,43,248.00 COMPLETED
3 Raw Material Handling System (Pkg-066) SAIL/BSL 1,172,919,700.00 COMPLETED
4 Supply, Construction, Fabrication, Erection and Commissioning of complete civil & structural part of proposed madhuband NCL Caol Washery Complex (5.0 MTPA) HEC 876,431,147.00 COMPLETED
5 Installation of Cast House SGP at BF # 1,2 & 3 (Main Pkg-1.0) SAIL/BSL 624,863,370.00 COMPLETED
6 Balance Civil Works for New CRM Complex (Pkg-037C) SAIL/BSL 492,492,816.00 COMPLETED
7 Fabrication, Erection, Painting and Cladding of steel Structure of New CRM Complex (Pkg-037D) HSCL 335,324,828.00 COMPLETED
8 Modernization of SMS-1 Enabling Works SAIL/BSL - COMPLETED
9 Supply, Fabrication and Transportation of Raw Gas Trestle and Clean Gas Trestle Paul Wurth - COMPLETED
10 Dismantling of Raw Gas Duct Paul Wurth - COMPLETED
11 Crane 200 Ton Capacity + Mobilisation Paul Wurth - COMPLETED
12 Erection of Mechanical Equipment, Structures, Duct and Pipe Work Paul Wurth - COMPLETED
13 Construction of foundations, Hydraulic Building and Pump House Building Paul Wurth - COMPLETED
14 Construction & Drinking water system for New CRM Complex (Pkg-123B) SAIL/BSL - COMPLETED
15 Erection of steel Structures for Gas Cleaning Plant Paul Wurth - COMPLETED
16 Erection of Scrubber & Demister of Gas Cleaning Plant Paul Wurth - COMPLETED
17 Supply, Fabrication and Transportation of Structure for GCP Paul Wurth - COMPLETED
18 Construction of Balance Work O&M Workshop Building under offsite civil works Package, Stage-II NTPC - COMPLETED
19 Civil Work for main foundation of Scruber, Demister & Technological Structures, Hydraulic & Pump House. Paul Wurth - COMPLETED
20 Balance Civil & Structural Work for Installation of 2nd Laddle Furnace (Pkg-A-2) in SMS-II at Bokaro Steel Plant SAIL/BSL - COMPLETED
21 Co Gas Line in the Zone affected by Phenolic Vapour in Coke Oven of Bokaro Steel Plant SAIL/BSL - COMPLETED
22 Structural Steel Works for construction of service building, loco sheds, MGR Workshop Building, Paint shed staff Qtrs. For MGR system of NTPC Sipat Super Thermal Power Project (Pkg-VI-part-II) UPL - COMPLETED
23 Replacement of damaged valley gutters, rolling shutters in Stores area (Shed No. C8-9, C-2 Shed 1 to 3 in Aux. Shops/C.O refractory stores) of Bokaro Steel Plant SAIL/BSL - COMPLETED
24 Civil, Structural, Electrical & Instrumentation Work (Enabling Package) for upgradation of BF-2 of Bokaro Steel Plant SAIL/BSL - COMPLETED
25 i) Heating of tools & tackles (SM 801) ii) Operating tools & tackles (SM-802) iii) Temporary stoves for preheating temporary gas pipeline & sleeve for thermocouple (SM-4050) required for rebuilding of Coke Oven Battery No. 5 MECON - COMPLETED
26 Mechanical & Structural work and HPLA work required for Cold Repair of Coke Oven, Battery No. 8 at Bokaro Steel Plant MECON - COMPLETED
27 Supply, Fabrication and Erection of Bunker Support. ALSTOM - COMPLETED
28 Design, Engineering, Supply of piping structural work, erection and commissioning of replacement of pressure and level balancing line of deaerator (1 to 5) of TPP I.L. (KOTA) - COMPLETED
29 Supply of fabricated building structure (Pkg-SM-812) required for Rebuilding of Coke Oven Battery No. 5 at Bokaro Steel Plant MECON - COMPLETED
30 Design, Engineering, Manufacturing, Supply, Transportation, Storage, Erection, Testing & Commissioning of 10 Tonne Underslung Crane with infrastructure facility for CHSGP in BF-5 of Bokaro Steel Plant I.L. (KOTA) - COMPLETED
31 Dismantling of existing lining removal of residule coal from bunkers and erection of new polymer lining at BSL MECON - COMPLETED
32 Provision of tar injection system in BF-1 Civil & Structural Work HSCL - COMPLETED
33 Supply & Erection work of airline, Tar line & other associated work in tar injection plant in BF-1 of BSL I.L. (KOTA) - COMPLETED
34 End Vertical Repair in Battery No. 8 SAIL/BSL - COMPLETED
35 Supply & Erection of Refractories (Pkg-36A) SAIL/BSL - COMPLETED
36 Replacement of 6 Nos. Vertical Pump SAIL/BSL - COMPLETED